Studio Stories

Current projects and musings. Thanks for reading!

"First In" is complete.

The recently completed Italian and Mexican glass mosaic for Mesquite Fire Station #4 was completed in June, 2021. Design © John Wehrle, Trout in Hand Studio. Mosaic © Julie Richey Mosaics, LLC.

The finished mosaic! Photo by Danny Fulgencio.

“First In” detail. Photo by Danny Fulgencio.

Installation crew led by Romeo De Candido Luxury Mosaics and Construction.

Mesquite Fire Station #4: In progress

6/13/2021 UPDATE: The mosaic is complete! We carefully packed the sections and I drove back to Dallas to lay it out on the studio floor for the first time. I’ve added signatures (John Wehle’s and mine). Now we just have to work against the heat and intense sunlight to install it on the exterior vertical wall of Station #4. Installation will take place Wednesday, June 15th - June 21. Pics to follow.

Laying out each section to test the fit. Photo by Mark Lefkin.

Laying out each section to test the fit. Photo by Mark Lefkin.

Limited table space in my Taos studio meant I was only able to see the result of a year’s work by bringing the mosaic to the Dallas studio. First time viewing the completed mosaic! Photo by Mark Lefkin.

Limited table space in my Taos studio meant I was only able to see the result of a year’s work by bringing the mosaic to the Dallas studio. First time viewing the completed mosaic! Photo by Mark Lefkin.

It’s slow going, especially since the project is in Taos at the garage studio. Two weeks there, two weeks in Dallas. Rinse off the desert dust and repeat. We had to stop temporarily to complete a time-sensitive project in Fort Worth, but soon we’ll be back in the studio to complete the final sections. I’d say we are 75+ percent complete.

Mesquitestar.JPG
Mesquitehose.JPG
While awaiting helmet revisions on the front firefighter, I decided to finish the fire in the grass. Now, all 7 pieces across the bottom are complete. Not all would fit on the table.

While awaiting helmet revisions on the front firefighter, I decided to finish the fire in the grass. Now, all 7 pieces across the bottom are complete. Not all would fit on the table.

We had to make an adjustment to the helmet style of the yellow front helmet. Here is the new version, whose pattern will be spliced into the existing one.

We had to make an adjustment to the helmet style of the yellow front helmet. Here is the new version, whose pattern will be spliced into the existing one.

Fun with reds! I’ve started incorporating some MVM Mexican smalti into the mix, because it’s giving me some reds I don’t have in the Italian palette.

Fun with reds! I’ve started incorporating some MVM Mexican smalti into the mix, because it’s giving me some reds I don’t have in the Italian palette.

As the finished sections get taller (I’m one panel away from the full 12-foot height), it’s harder to photograph.

As the finished sections get taller (I’m one panel away from the full 12-foot height), it’s harder to photograph.

The sky is a wonderful mix of smoke, flames and movement.

The sky is a wonderful mix of smoke, flames and movement.

It’s getting too large to fit on the work tables!

It’s getting too large to fit on the work tables!